Long-term
• Through June 30: Route 143, Hawk Mountain Road to Old Philly Pike, Albany Township. Single lane with traffic signal around the clock. Detour via Stoney Run Valley Road for access to and from Route 737.
• Through 2023: Smoketown Road at the Little Sacony Creek Bridge, Rockland Township, closed.
• Through 2023: North Reading Avenue at Montgomery Avenue, Colebrookdale Township, lane restrictions, 9 a.m. to 3 p.m.
• Ongoing: Gibraltar Road at Shelbourne Road, Exeter Township. One-way traffic on bridge at all times. Bridge expected to reopen in both directions by late August.
• Ongoing: Funk Road bridge in Colebrookdale Township, closed indefinitely due to deterioration.
Daily
• Tuesday-Saturday: Route 222, Paper Mill Road to Route 724, Wyomissing Road and Spring Township, construction, 7 p.m. to 6 a.m.
• Tuesday-Saturday: Route 12, Route 422 Interchange to River Road, Reading, 7 p.m. to 6 a.m.
• Tuesday-Friday: Interstate 78, Exit 17 (Route 419) to Exit 35 (Route 143), Bethel Township, sweeping, 7 p.m. to 5:30 a.m.
• Tuesday-Friday: Route 183, Route 222 to Schuylkill County line, Bethel Township, 7 a.m. to 3 p.m.
• Tuesday-Friday: Crystal Ridge Road, Crystal Cave Road to Route 143, Richmond Township, brush cutting, 7 a.m. to 3 p.m.
Source: Berkshire mont
