Daily
• Monday-Friday: Route 12/Route 73 intersection, Ruscombmanor Township, utility work, 9 a.m. to 3 p.m.
• Monday-Friday: Route 10, Route 422 to Route 23, crack sealing, 7 a.m. to 3 p.m.
• Monday-Friday: Interstate 78, Exit 29 (Route 61) to Exit 35 (Route 143), Hamburg and Tilden Township, drainage, 7 a.m. to 3 p.m.
• Monday-Friday: Interstate 78, Exit 23 (Shartlesville) to Exit 35 (Route 143), Tilden Township and Hamburg, brush cutting, 7 a.m. to 3 p.m.
• Monday-Friday: Charming Forge Road, Tulpehocken Forge Road to Bernville Road/North Heidelberg Road, Lower Heidelberg Township, drainage, 7 a.m. to 3 p.m.
• Monday-Friday: Windsor Castle Road, Route 662 to South Fourth Street, Windsor Township, brush cutting, 7 a.m. to 3 p.m.
• Monday-Friday: Lyons Road/State Street, Centennial Road to Route 100, Longswamp and Hereford townships, crack sealing, 7 a.m. to 3 p.m.
• Tuesday-Wednesday: Wyomissing Road, Rudloff Lane to Vermont Road, Cumru Township, construction, 7 a.m. to 3 p.m.
• Thursday-Friday: Wyomissing Road, Rudloff Lane to Vermont Road, Cumru Township, construction, 7 a.m. to 3 p.m.
Source: Berkshire mont