Site icon Robesonia Pennsylvania

Road projects, March 6, 2022

Long-term

• Through 2023: Smoketown Road at the Little Sacony Creek Bridge, Rockland Township, closed.

• Through July 27: Route 222 westbound in West Earl and Ephrata townships, Lancaster County, milling, paving, base repairs, concrete patching, guide rail upgrades, drainage, signs and pavement markings, 6 a.m. to 2 p.m.

• Through Aug. 29: Manatawny Road between Pine Forge Road and Grosstown Road, Douglass Township: closed for bridge repair.

Daily

• March 7-11: Route 73 between Allentown Pike and Memorial Highway, Maidencreek and Ruscombmanor Townships, crack sealing, 7 a.m. to 3 p.m.

• March 7-11: Route 422 between Big Spring and Green Valley roads, Lower Heidelberg Township, brush cutting, 7 a.m. to 3 p.m.

• March 7-11: Old Route 22 between Kohler Hill Road and Lehigh County, Greenwich Township, brush cutting, 7 a.m. to 3 p.m.

• March 7-11: Interstate 78 between Berks County and Exit 49 (Route 100), Lehigh County, highway beautification, 9 a.m. to 2 p.m.

• March 7-10: Route 183 between Four Point Road and Schuylkill County, Bethel Township, drainage, 7 a.m. to 3 p.m.


Source: Berkshire mont

Exit mobile version