Press "Enter" to skip to content

Road projects, week of July 31, 2022

Long-term

• Through 2023: Smoketown Road at the Little Sacony Creek Bridge, Rockland Township, closed.

• Through Aug. 29: Manatawny Road between Pine Forge Road and Grosstown Road, Douglass Township: closed for bridge repair.

• Ongoing: Route 10 at Freemansville Road, Cumru Township, reconstructing and realigning intersection, weekdays; a permittee project.

• Into October: Route 737 between Eagle Point Road and Zettlemoyer Road in Maxatawny and Greenwich townships, milling, paving and more, 7 p.m. to 5 a.m. weekdays.

• Through Oct. 28: Creek Road closed between Kistler Valley Road and Old Philly Pike, Albany Township, bridge repair.

• Through Aug. 19: St. Lawrence Avenue (Route 562) between Shelbourne Road and Seidel Road, Exeter Township, utility work, 9 a.m. to 3 p.m.

Daily

• July 31-Aug. 6: Route 222 between Tek Park Drive and Old Topton Road, Lehigh County, construction, 8 p.m. to 6 a.m.

• Aug. 1-6: Interstate 78 between Exit 30 (Hamburg) and Exit 35 (Route 143), construction, 7 p.m. to 6 a.m.

• Aug. 1-2: Interstate 78 between Exit 19 (Route 183) and Exit 23 (Shartlesville), maintenance, 7 a.m. to 3 p.m.

• Aug. 1-2: Tulpehocken Forge Road between Water Street and Quarry Road, Heidelberg Township, drainage, 7 a.m. to 3 p.m.

• Aug. 1: Interstate 78 between Exit 23 (Shartlesville) and Exit 35 (Route 143), litter removal, 7 a.m. to 3 p.m.

• Aug. 2-5: Garfield Road between Route 61 and Plum Creek Road, Centre and Ontelaunee townships, drainage, 7 a.m. to 3 p.m.

• Aug. 2-5: Route 222, Paper Mill Road to Route 724, Spring Township and Wyomissing, overnight work, 7 p.m. to 6 a.m.

• Aug. 3-4: Shoemakersville Road between Ohlinger Road and West Shore Drive, Ontelaunee and Maidencreek townships, drainage, 7 a.m. to 3 p.m.

• Aug. 4: Interstate 78 West between Exit 23 (Shartlesville) and Exit 19 (Route 183), widening, 7 a.m. to 3 p.m.

• Aug. 5: Route 562 between Schoffers Road and Oley Line Road, Exeter Township, drainage, 7 a.m. to 3 p.m.

• Aug. 5-7: Route 222 between Paper Mill Road and Route 422, Wyomissing, construction, 7 p.m. to 10 a.m., 15 hours.

• Aug. 8: Route 422/222 interchange ramps, Wyomissing, bridge inspection, 9 a.m. to 3 p.m.

• Aug. 9: Old Church Road between Route 183 and North Heidelberg Road, North Heidelberg Township, bridge inspection, noon to 4 p.m.

• Aug. 9: Heidelberg Road between Route 183 and Christmas Village Road, North Heidelberg Township, bridge inspection, 9 a.m. to 3 p.m.

• Aug. 10-12: Interstate 78 between Exit 40 (Route 737) and Exit 29 (Route 61), bridge inspection, 9 a.m. to 3 p.m.

• Aug. 18: North Wyomissing Boulevard, Wyomissing, bridge inspection, 9 a.m. to 3 p.m.

• Aug. 22: Route 222 between Route 422 and Route 724, Spring Township, bridge inspection, 9 a.m. to 3 p.m.

• Aug. 25: State Hill Road between Woodland Road and Penn Avenue, Wyomissing, bridge inspection, 9 a.m. to 3 p.m.


Source: Berkshire mont

Be First to Comment

    Leave a Reply